span of control

英 [spæn ɒv kənˈtrəʊl] 美 [spæn əv kənˈtroʊl]

网络  控制跨度; 管理幅度; 控制幅度; 管理跨度; 控制范围

计算机经济



双语例句

  1. The researchers offered several possible reasons for managers'increased span of control, the technical term for how many workers are being supervised.
    研究人员对经理人“控制幅度”指每位经理人能有效监督的员工人数的拓展给出了几种可能的解释。
  2. An important factor in deciding how to structure a business is the span of control.
    决定如何组织企业的要素之一是控制幅度。
  3. An organic organization has the structural characteristics mentioned above and others like wide span of control, cross-functional teams, free flow of information and low formalization.
    一个有机组织的结构特征,上述提及到的以及其他类似的大跨度的控制,跨功能团队,自由流通的资讯和低形式化。
  4. Try to get to a description of something you want that is within your span of control, even if it involves the help of others to make it happen.
    试着对某样在你控制范围内,你想要的某样东西进行描述,即便这需要别人的帮助来实现。
  5. Factors such as unity of command, delegation, and span of control all need to be considered.
    统一指挥、委任和控制幅度等因素全都需要列入考虑的范畴。
  6. Managers have a wide span of control.
    经理的职权范围很大。
  7. As for the large span steel roof structures of irregular shape, the wind load is one of the main control loads in the design.
    对于体型复杂的大跨度钢屋盖结构来说,风荷载是控制结构设计的主要荷载之一。
  8. For variation of models, the SC current of OPGW will have sudden change at the NK position of the OPGW mode-change tower. If the maximum value occurs within the span of NK to NK+ 1, I NK+ 1 should be the control conditions.
    当型号变化时,OPGW中的短路电流在变线塔NK处发生突变,若最大值出现在NK至NK+1档内,则INK+1为控制条件。
  9. Based on the control process of construction of concrete-filled steel-tube arch bridge with large span, we describe the design and implemental method of the control system software IABS 2000 which is developed specially for the construction control of concrete-filled steel-tube arch bridge with large span.
    本文以大跨度钢管混凝土拱桥的施工控制过程为研究基础,阐述了专用于钢管混凝土拱桥施工控制的系统软件IABS2000的设计方案及实现方法。
  10. Based on the principles of AMD vibration control of large span cable-stayed bridge, a combined method of couple model space control is presented, and the equation of vibration control is formulated.
    根据AMD振动控制的原理及悬索桥的动力特性,提出一种基于耦合模态法和经典最优控制法相结合的方法,并推导出其振动控制方程。
  11. They are short of educational management experience and the understanding of span of control and its importance.
    五是济南市初中学校中百分之八十的正职校长处于校长成长过程中的初期阶段,教育管理的经验积累不足,对管理跨度的概念及其重要性的认识欠缺。
  12. The Optimal Span of Control in Management On the Appropriate Levels and Extents of Administration in China
    管理中的最优控制幅度我国行政管理层次幅度合理化的探讨
  13. Research on the Span of Control of Middle School Principal in Jinan
    济南市初中校长管理跨度的调查与研究
  14. The superstructure of the main bridge of a bridge is a through bowstring arch bridge of concrete-filled steel tubes with calculated span length 84 m. This paper presents the optimization calculation of monitoring and control at both the early stage and in course of the construction of the bridge.
    某桥主桥上部结构为计算跨径84m的下承式钢管混凝土拱桥,介绍对该桥进行的施工监控前期的优化计算,以及施工监控过程中的优化计算。
  15. The main factors which influence the span of control and the influence exerted by the span of control.
    影响校长管理跨度的主要因素以及管理跨度对学校管理层次的影响四个方面。
  16. The standard scores of neurobehavioral functions, except digit span and digit symbol, of experimental group were obviously lower than that of control group.
    除数距广度和数字译码外,实验组的其余行为功能项目的标准得分明显低于对照组。
  17. Aimed at the problems such as over span adjustment and prolonged adjustment time of the conventional temperature control system of the injection machine, a temperature control system based on fuzzy PID was put forward.
    针对传统注塑机温控系统超调量大、调节时间长等缺点,提出了基于模糊自适应PID的注塑机温控系统,阐述了模糊PID控制器的设计方法及该温控系统的软硬件实现方法。
  18. In combination with the characteristics of steel box girder construction in the building of long span cable stayed bridges, the composition of a real time survey control system and its control over the construction are studied.
    结合大跨度斜拉桥钢箱梁的施工特点,研究了施工实时控制系统的构成及其对施工过程的控制。
  19. Combined with specific project, it discusses structural construction of bent pole in 12 m span factory building, experiences of structural construction are introduced from axial level control 、 connection between pole with wall and reinforcement engineering, and putts forward matters need attention.
    结合具体的工程实例,对12m跨厂房排架柱结构施工要领作了探讨,从轴线标高控制、柱墙连接、钢筋工程方面,介绍了结构施工方面的实践经验,并提出一些应注意的事项。
  20. However, educators haven't attached enough importance to the span of control, so the research of this period has crucial instructive meaning and practical value.
    然而初中学校校长的管理跨度的研究还没有引起教育工作者足够的重视,所以进行此项研究具有十分重要的指导意义和实践价值。
  21. Fascination of Big Span Roof as a Kind of Structure Art& Talking about the Methods of Research and Control that Using by Structure Engineer
    作为结构艺术的大跨度屋顶的魅力&论结构工程师所使用的研究与控制的方法
  22. Especially in the control of the cable-stayed bridge with span length of 1000-m scale, the limitation of traditional construction control methods becomes more obviously. Thus a whole-procedure adaptive construction control system based on geometry control method, comes into being.
    传统施工控制方法在千米级斜拉桥施工监控中的局限性已越来越明显,基于几何控制的全过程自适应控制系统应运而生。
  23. With increasing span length and structure complexity of a cable-stayed bridge, Construction control and monitoring plays an important note during erection of the bridge girder.
    斜拉桥是现代大跨度桥梁最具竞争力的桥型之一。随着斜拉桥跨度和构造复杂性的增大,斜拉桥的施工监测与控制对保证桥梁的顺利建成起着重要的作用。
  24. With the increase of the span of the prestressed concrete beam bridge, it has become indispensable to efficaciously apply construction control to the project.
    随着预应力混凝土桥梁跨径不断增大,大跨径桥梁建设过程中实施有效的施工控制已必不可少。
  25. Based on the previous researches, the current research aimed to revise the scale of action control in college students and examine the influence of emotion to working memory span, as well as the moderating effect of the action control.
    本研究在前人的基础上,旨在我国大学生中修订行动控制量表,并探讨行动控制在情绪与工作记忆广度之间的关系。
  26. The second chapter explains the 4 theoretical foundations of the flattening management model, namely span of control theory, chain of command theory, centralization and decentralization theory, and process reengineering theory. These 4 theories are the foundation of this whole dissertation.
    第二章阐述了扁平化管理模式的四个理论依据即控制跨度理论、命令链理论、集权化和分权化理论及流程再造理论,作为整篇文章的立论基础。
  27. The cable is a very important member in the cable bridge, and its length is greatly increasing with the span of the bridge. The vibration control of a light and long cable is an attentive focus.
    斜拉索是斜拉桥等索支撑结构中重要的受力构件,随着斜拉桥跨度的逐渐增加,拉索也越来越长,轻而长的拉索的振动控制问题也日益突出。
  28. Along with the augment of bridge span and the development of bridge construction technique, construction control of long span bridge became more vital in design and construction, which takes more attention.
    随着桥梁跨径的增大、桥梁施工技术的发展,大跨径桥梁的施工控制问题也日益成为设计和施工中的关键而备受关注。
  29. With the increase in span of bridges, construction of sub-cantilever structure analysis and control problem is also increasingly becoming a design and construction of the key questions and has drawn greater attention.
    随着桥梁跨度的增加,桥梁分段悬臂施工的结构分析与控制也日益成为设计和施工中的关键问题,其重要性倍受关注。